loader image

Subway Station

1 Decembrie

The 1 Decembrie subway station was open in 2008 and is part of the extension of the Metro line 3 of Bucharest.

Technical details

  • Sub-crossing of tram lines, maintaining these in use (pedestrian passage gallery between accesses)
  • Sub-crossing of the boulevard, maintaining the car traffic (pedestrian passage gallery between accesses)
  • Box walls
  • Injections with bentonite-cement suspensions (strength and sealing)
  • Sealing injections with polyurethane resins
  • Reinforced concrete and masonry interior construction
  • Waterproofing works
  • Earth fillings
  • Railway and related infrastructure
  • Curtain walls of trespa panels on aluminum skeleton eurofox
  • Aluminum false ceilings - boxed and linear
  • Aluminum curtain walls
  • Plasters, washable and epoxy paints
  • Natural stone cladding for floors and walls
  • Production and assembly of bond cassettes
  • Metal constructions and stainless steel railings
Value of the contract
8.122.820 lei + VAT
Beneficiary
Metrorex S.A.
Opening year
2008
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.