loader image

Somet Projects

Specialized in complex projects

Subway Constructions

Civil and Industrial Constructions

Civil and Industrial Constructions

Subway Construction

Multimodal Terminal

Străulești

The first intermodal node in Romania that connects the underground public transport, the surface public transport and a multi-level car parking.

Value of the contract: 40 mil. lei

Subway Depot

Străulești

The largest subway depot in Romania, located in the northern part of Bucharest.

Value of the contract: 82 mil. lei

Connecting Gallery

Metro Line 4 - Străulești Depot

Gallery connecting Metro Line 4 and the Străulești Metro Depot.

Value of the contract: 61 mil. lei

Subway Station

Tudor Arghezi

New surface subway station that extends Metro Line 2 up to the Bucharest Ring Road.

Value of the contract: 181 mil. lei

Subway Station

Străulești

Străulești Station is the last station on Metro Line 4, open in 2017, with the purpose of being an intermodal node station.

Value of the contract: 75.5 mil. lei

Subway Station

Laminorului

Laminorului is the 5th station of the Metro Line 4 of Bucharest, open in 2017, which serves the area Bucureștii Noi.

Value of the contract: 72.3 mil. lei

Subway Station

Parc Bazilescu

Opened in 2011, Parc Bazilescu is a subway station in Metro Line 4 of Bucharest.

Value of the contract: 11.7 mil. lei

Subway Station

Jiului

Jiului subway station was open in 2011 and is part of the Metro Line 4 of Bucharest.

Value of the contract: 15.1 mil. lei

Subway Station

1 Decembrie

The 1 Decembrie subway station was open in 2008 and is part of the extension of the Metro line 3 of Bucharest.

Value of the contract: 8.12 mil. lei

Elevators And Platforms

Bucharest Subway Stations

Execution and installation of elevators and platforms for people with disabilities (Metro Lines 1, 2 and 3).

Value of the contract: 79 mil. lei

Subway Station

Anghel Saligny

It is a terminus highway (Metro Line 3) in the eastern part of Bucharest, near the A2 Motorway.

Value of the contract: 4.2 mil. lei

Escalators and Coverings

for Subway Accesses

Execution works and installation of escalators for the access of disabled persons in the existing subway network (Metro Lines 1, 2 and 3 of Bucharest).

Value of the contract: 105 mil. lei

Subway Railway

1 Mai - Parc Bazilescu (M4)

Execution of the railway and the third rail on the section 1 Mai - Parc Bazilescu on Metro Line 4 of Bucharest.

Value of the contract: 26.6 mil. lei

Subway Station

Nicolae Grigorescu 2

Nicolae Grigorescu 2 subway station, which serves the connection between the Metro Line 3 and the Anghel Saligny station.

Value of the contract: 9.4 mil. lei

New Access

Nicolae Grigorescu 1

Execution works for the new access for Nicolae Grigorescu 1 Subway Station.

Value of the contract: 2.4 mil. lei

Correspondence Between

Piața Victoriei 1&2

Modernization works in order to streamline the public access between the subway stations Piața Victoriei 1 and Piața Victoriei 2.

Value of the contract: 4.3 mil. lei

Subway Station

Nicolae Teclu

Nicolae Teclu is a subway station on Metro Line 3, located near the A3 Motorway.

Value of the contract: 6.9 mil. lei

New Access

Tineretului Station

Execution of architectural works for the Tineretului Metro Station: 2 accesses, connecting passage, platform connecting vestibule.

Value of the contract: 2.6 mil. lei

Civil and Industrial Constructions

Autograph Hotel

Marriott 5★

Consolidation and remodeling of a UNESCO World Heritage Site building into a 5* Autograph By Mariott Hotel.

Value of the contract: 30 mil. lei

Courtyard Hotel

Marriott 4★

Design and execution of a hotel structure belonging to the Marriott chain in the northern part of Bucharest

Value of the contract: 24 mil. lei

Radiotherapy Clinic

MedEuropa

Radiotherapy clinic in Bucharest.

Value of the contract: 9 mil. lei

Residential Project

Atria Urban Resort – Phase 1

Residential project of 160 apartments in the northwestern part of Bucharest.

Value of the contract: 26.6 mil. lei

Residential Project

Atria Urban Resort – Phase 2

Residential project of 396 apartments in the northwestern part of Bucharest.

Value of the contract: 67.8 mil. lei

Residential Project

Atria Urban Resort – Phase 3

Residential project of 350 apartments in the northwestern part of Bucharest.

Value of the contract: 95 mil. lei

Residential Project

Tineretului Park Residence

Residential project of 162 apartments next to Tineretului Park, Bucharest.

Value of the contract: 36.9 mil. lei

Office Building

Multigalaxy

Offices and video production studio in Bucharest.

Value of the contract: 17 mil. lei

Training Center

ISU

Emergency training and prevention center.

Value of the contract: 7 mil. lei

Offices and Video Production Studio

Studio Video Art

Offices and video production plant in Bucharest.

Value of the contract: 1.3 mil. lei

Production Plant

Metal Confections

Metal confection production plant in Bucharest.

Value of the contract: 1 mil. lei