Elevators And Platforms

Subway Stations

Bucharest

Technical details

Execution and completion of works for the access of disabled persons in the existing subway network of Bucharest (Metro Lines 1, 2 and 3).

  • Execution details design
  • Excavations
  • Secant and tangent drilled columns
  • Timbering works
  • Dewatering works
  • Network deviations
  • Reinforced concrete structures
  • Sealing and reinforcing injections
  • Waterproofing works
  • Earth fillings
  • Plasters, washable and epoxy paints
  • Natural stone cladding for floors and walls
  • Production and assembly of bond cassettes
  • Epoxy and thermal foam paints on metal
  • Various metal constructions and stainless steel railings
Value of the contract
79.056.150 lei + VAT
Number of platforms
44
For the Highways
M1, M2 and M3
Beneficiary
Metrorex S.A.
Number of elevators
32