Elevators And Platforms
Subway Stations
Bucharest
Technical details
Execution and completion of works for the access of disabled persons in the existing subway network of Bucharest (Metro Lines 1, 2 and 3).
- Execution details design
- Excavations
- Secant and tangent drilled columns
- Timbering works
- Dewatering works
- Network deviations
- Reinforced concrete structures
- Sealing and reinforcing injections
- Waterproofing works
- Earth fillings
- Plasters, washable and epoxy paints
- Natural stone cladding for floors and walls
- Production and assembly of bond cassettes
- Epoxy and thermal foam paints on metal
- Various metal constructions and stainless steel railings





