Execution and completion of works for the access of disabled persons in the existing subway network of Bucharest (Metro Lines 1, 2 and 3).

  • Execution details design
  • Excavations
  • Secant and tangent drilled columns
  • Timbering works
  • Dewatering works
  • Network deviations
  • Reinforced concrete structures
  • Sealing and reinforcing injections
  • Waterproofing works
  • Earth fillings
  • Plasters, washable and epoxy paints
  • Natural stone cladding for floors and walls
  • Production and assembly of bond cassettes
  • Epoxy and thermal foam paints on metal
  • Various metal constructions and stainless steel railings
Value of the contract
79.056.150 lei + VAT
Number of platforms
44
For the Highways
M1, M2, M3
Beneficiary
Metrorex S.A.
Number of elevators
32
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.