loader image

Connecting Gallery

Metro Line 4 - Străulești Depot

The connecting gallery consists of: 8 parking lines for the trains, 1 washing line, 4 overhaul and intervention lines and 2 technical spaces, and connects the Străuleşti station with the Străuleşti Depot.

Technical details

  • Molded walls and bars
  • Internal and external dewatering
  • Cut-and-over floors
  • Metal lining and yarns
  • Concrete splicing
  • Reinforced concrete and masonry interior construction
  • Waterproofing works
  • Earth fillings
  • Railway and related infrastructure
  • Fire resistant doors
  • Plasters, washes, washable paints
  • Epoxy floors and paints
  • Tile and floor tile cladding
  • Metal constructions and stainless steel railings
Value of the contract
61.000.000 lei + VAT
Concrete Floor
1.5 m thick
Beneficiary
Metrorex S.A.
Opening year
2018
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.